A. Series of activities performed on the production process are:
- Making frame.
- Manufacture of molds.
- Manufacture of concrete mixes.
- Casting of concrete.
- Treatment (curing).
- Completion of the final.
- Storage.
B. Transport and Conveyances
Transportation is the removal of the precast elements of the factory to the installation location. The transportation system affects the time, the efficiency of construction and transport costs.
Things to consider in the transport system are:
- Specification of transport equipment
- Transport Route
- Licensing
Lifting equipment i.e. moving elements of the buildup to the position of the connection.
Lifting equipment to install the precast concrete can be categorized as follows:
- Taps mobile
- Telescopic faucet
- Faucet tower
- Tap portal
C. Implementation of Construction (Erection)